Skip to content

Timeline

The timeline is a Gantt chart of every package that started. Each row is one package, and its bar runs from the start to the end of its build. A dashed line marks the current time while the build runs. The bar colors match the graph: green for done, blue for building, striped red for failed, and orange for aborted.

The timeline of the full Autoware build, sorted by duration: the longest packages on top The timeline of the full Autoware build, sorted by duration, dark theme

Find what slows the build

The timeline shows how well the build uses its workers. Many bars side by side mean a parallel build. One long bar alone means that the build waits for that package.

The Order menu sorts the rows:

  • Start time: the order in which the packages started. This is the default.
  • Duration: the longest package first. Use it to find the packages to speed up.
  • End time: the order in which the packages finished.
  • Status: the failed packages first.
  • Change: the packages that got slower first, against the run that Compare shows.

The page keeps your choice.

Compare with another run

The Compare menu shows why one run took longer than another. It draws the time of each package in the other run as a light outline behind its bar. After the bars, a red label such as +42s marks a package that got slower, and a green label such as −10s marks a package that got faster. The label new marks a package that was not in the other run.

  • Last run: the previous run of the same kind.
  • Usual times: the median time of each package over up to five earlier runs.
  • An earlier run: any build or test run that the log directory still keeps.

A label shows a change of 10 seconds, or a change of 2 seconds and 10 %. Beside the menu, a line gives the change of the whole run and counts the slower, faster, and new packages. It gives the change of the whole run only when both runs ran all their packages to the end, with no abort and no package that a failure blocked. Choose Change in the Order menu to see the largest changes on top.

After a build, the progress line shows how much slower or faster the build was than the last run, when both runs ran all their packages to the end. Click it to open the timeline with this comparison.

While the build runs

The timeline during a live build of ros2/examples: the building packages in blue up to the dashed line of the current time, and the finished packages in green The timeline during a live build of ros2/examples, dark theme

The timeline scrolls to the newest packages as they start. Scroll up to stop this, or click Follow to start it again. A reload of the page keeps your place.

Read and move

  • The time axis stays at the top while you scroll.
  • A long package name ends in "…", and its tooltip shows the full name. Drag the right edge of the name column to make it wider. Double-click the edge to fit the column to the names again.
  • Drag anywhere to pan, like in the graph.
  • Click a bar or a name to open the log of that package.

Side by side

Side by side shows the timeline and the graph together, with a bar between them that you can drag. It is the default view. In this view, a click on a package also moves the graph to it. The page keeps the view and the split.